Kovanlık HEPP

Project Detail

Kovanlık HEPP is located at Bulancak district, Giresun city in East-Blacksea Basin. The conveyance of water from Kovanlık weir to headpond is done by 9632 m length free flow tunnel. Steel penstock length is 1112 m and will be installed inside vertical and sloped tunnel. There will exist 3 Pelton turbines inside powerhouse and total installed power will be 58.383 MWm / 57.215 MWe. Total produced energy is 154.12 GWh.


  • Investor
  • Kovanlık Energy
  • Location
  • Bulancak Giresun
  • Installed Power
  • 57.22 MW
  • Design Discharge
  • 20 m³/s
  • Net Head
  • 327.00 m
  • Contract Year
  • 2017
  • Services
  • FR
  • FD
  • DeD
  • Progress
  • Processing