Pervari HEPP

Project Detail

Project is located around Pervari district within Siirt city. Main water resource of the project is Müküs Creek which is upstream tributary of the Botan basin.

Project is planned for evaluating hydro potential in between 1480.0 m and 980.0 m.

Beray prepared the conceptual design report and also prepared investment report for the credit studies of financial institutes.


  • Investor
  • ONK Elektrik Üretim San. ve Tic. A.Ş.
  • Location
  • Pervari/Siirt
  • Installed Power
  • 210 MW
  • Design Discharge
  • 45.00 m³/s
  • Net Head
  • 500.00 m
  • Contract Year
  • 2013
  • Services
  • FR
  • FD
  • DD
  • Progress
  • Planning Stage