Tedzani-4 HEPP is located on Shire River in Malawi which is in Africa continent. Intake structure will be integrated to an existing dam lake. The headrace length is 600 m and will divert flow to headtank. The length of penstock is 100 m. There will be one unit inside the powerhouse.
2024 © Beray Mühendislik. All rights reserved.